HexaHome

Find Your Dream Home Faster

starstarstarstarstar(5.0)

Looking for Property Near Chennai Metro Orange Line? Click to Download App Available On!

Introduction

The Chennai Metro Orange Line is a vital part of Phase 2, connecting Poonamallee Bypass to Lighthouse. Designed to ease traffic congestion and improve urban mobility, it enhances citywide connectivity with modern infrastructure and faster travel options.

Metro

Image Source: Google

Overview of Chennai Metro Orange Line

PeriodKey Developments
2016–2018Initial planning and feasibility studies conducted under Chennai Metro Rail Phase 2 proposal, identifying the Poonamallee–Lighthouse corridor as a priority route.
2019–2020Detailed project reports (DPR) prepared and approved by Chennai Metro Rail Limited (CMRL) and the Tamil Nadu Government.
2021–2022Central Government approval granted; land acquisition and tendering processes initiated for key sections of the Orange Line.
2023–2024Construction began on elevated and underground stretches, with significant progress across stations and depot works.
2025–PresentOngoing development of remaining sections, track installation, and testing activities aimed at launching passenger services soon.


Loading...

Route Map and Project Details

ComponentDetails
Total Length26.1 km (approximately)
Route TypeCombination of elevated and underground sections
Starting PointPoonamallee Bypass
Ending PointLighthouse (Marina Beach)
Total Stations28 stations (18 elevated and 10 underground)
Major Interchange StationsAlwarpet, Kodambakkam, and Nandanam
Corridor AlignmentRuns along Poonamallee High Road, Mount Road, and Santhome areas
Implementing AgencyChennai Metro Rail Limited (CMRL)
Estimated Project Cost₹9,000 crore (approx.)
Expected CompletionPhase-wise openings expected by 2026

List of Stations and Key Interchanges

Station NameType / Interchange
Poonamallee BypassElevated – Starting Terminal Station
KattupakkamElevated
KarayanchavadiElevated
KumananchavadiElevated
Ramachandra HospitalElevated
IyyappanthangalElevated – Near major bus depot
Porur JunctionElevated
AlapakkamElevated
ValasaravakkamElevated
Meenambakkam BypassElevated
VadapalaniUnderground – Interchange with Green Line
KodambakkamUnderground – Interchange with Blue Line
TeynampetUnderground
NandanamUnderground – Interchange with existing Phase 1 corridor
Cathedral RoadUnderground
AlwarpetUnderground – Major interchange station
MylaporeUnderground
LighthouseUnderground – Terminal Station near Marina Beach

You Might Also Like


Searching Flats Near Chennai Metro Orange Line? Click to Download App Available On!

Connectivity and Major Areas Covered

SectionKey Areas Covered
Poonamallee Bypass – PorurCovers fast-developing western suburbs like Kattupakkam, Karayanchavadi, and Iyyappanthangal, improving access for residential and educational zones.
Porur – VadapalaniConnects Porur Junction, Ramachandra Hospital, and Valasaravakkam, easing travel for commuters and medical professionals.
Vadapalani – KodambakkamPasses through major commercial and entertainment hubs, linking shopping centers and offices in central Chennai.
Kodambakkam – NandanamEnhances city connectivity by linking business districts and offering interchanges with existing metro corridors.
Nandanam – LighthouseProvides direct access to cultural and coastal zones including Alwarpet, Mylapore, and Marina Beach, improving tourism and local travel convenience.

Metro

Image Source: Google

Construction Progress and Timeline

Year / PhaseConstruction Milestones
2021Project officially approved; tendering process initiated for elevated and underground sections of the Orange Line.
2022Land acquisition and utility shifting began across key stretches such as Poonamallee, Porur, and Vadapalani.
2023Civil construction commenced; piers and viaduct works started on the Poonamallee–Porur elevated corridor.
2024Major tunnel boring operations launched for underground sections between Kodambakkam and Lighthouse; station structure works in progress.
2025Finishing works, track laying, and system installation ongoing; phased trial runs expected to begin by late 2025.
2026 (Expected)Final testing, safety approvals, and public inauguration of the complete Orange Line corridor planned.
Metro

Image Source: Google

Thirumangalam Metro Station, Chennai Guide read for more

Benefits and Urban Mobility Impact

CategoryKey Benefits and Impact
Reduced Travel TimeThe Orange Line significantly cuts travel duration between Poonamallee and Marina Beach, easing daily commutes for thousands of passengers.
Traffic DecongestionHelps reduce road congestion along Poonamallee High Road and Mount Road by shifting commuters from private vehicles to metro services.
Enhanced ConnectivityProvides seamless integration with existing metro corridors, bus networks, and suburban railway systems, improving last-mile access.
Economic GrowthBoosts commercial activity along the corridor by improving accessibility to business hubs, shopping centers, and industrial areas.
Environmental BenefitsPromotes eco-friendly urban transport by lowering carbon emissions and reducing fuel consumption.
Urban DevelopmentEncourages real estate and infrastructure growth in western and central Chennai through improved connectivity and accessibility.

Economic and Real Estate Growth

SectorImpact and Development Highlights
Commercial DevelopmentImproved metro access is attracting new businesses, retail chains, and office spaces along Porur, Vadapalani, and Nandanam corridors.
Residential Real EstateProperty values in areas like Poonamallee, Iyyappanthangal, and Mylapore have seen steady growth due to enhanced metro connectivity.
Employment OpportunitiesConstruction, retail, and service sectors along the Orange Line are witnessing increased job creation and local economic stimulation.
Infrastructure InvestmentThe metro project has driven large-scale infrastructure upgrades, including better roads, drainage, and pedestrian facilities.
Tourism and HospitalityEasy access to cultural and coastal areas like Marina Beach and Mylapore is boosting tourism, hotel occupancy, and local business revenue.
Long-Term Economic ImpactThe Orange Line is expected to strengthen Chennai’s position as a major economic hub by improving transport efficiency and urban livability.
Metro

Image Source: Google

Future Expansion and Development Plans

Phase / PlanDetails and Future Developments
Phase 2B ExtensionProposals under review to extend the Orange Line beyond Lighthouse towards Thiruvanmiyur to enhance coastal connectivity.
Integration with Other CorridorsPlans to link the Orange Line with Blue and Green lines at key interchange stations for smoother inter-corridor travel.
Transit-Oriented Development (TOD)Development of commercial complexes, residential projects, and pedestrian-friendly zones near major metro stations.
Smart Mobility IntegrationAdoption of digital ticketing, real-time tracking, and multimodal transport apps for a seamless commuter experience.
Sustainability InitiativesImplementation of solar panels, rainwater harvesting, and energy-efficient systems across stations and depots.
Future Network ExpansionLong-term vision to connect the Orange Line with upcoming metro corridors and suburban routes under Phase 3 of Chennai Metro.

Loading...

Explore Prime Properties Along Chennai Metro Orange Line – Click to Download App Available On!

FAQs

Que: What is the Chennai Metro Orange Line?
Ans: The Chennai Metro Orange Line is a major corridor under Phase 2 of the metro expansion, connecting Poonamallee Bypass in the west to Lighthouse near Marina Beach in the east.

Que: What is the total length of the Orange Line and how many stations does it have?
Ans: The Orange Line spans approximately 26.1 km and includes 28 stations — 18 elevated and 10 underground — covering key residential and commercial areas across Chennai.

Que: When is the Chennai Metro Orange Line expected to be completed?
Ans: The line is expected to be operational by late 2026, with phased openings planned as construction progresses across different sections.

Que: Which areas will benefit the most from the Orange Line?
Ans: Major areas like Poonamallee, Porur, Vadapalani, Kodambakkam, Alwarpet, and Mylapore will gain faster and more reliable metro connectivity, reducing road congestion.

Que: What are the key advantages of the Orange Line for Chennai?
Ans: The project will improve urban mobility, reduce travel time, support eco-friendly transport, boost real estate development, and strengthen the city’s economic growth.

Scroll to top arrow
grid background

Buy, Sell & Rent Properties – Download HexaHome App Now!

  • Search Icon

    Find your perfect home, PG, or rental in just a few clicks.

  • House Icon

    Post your property at ₹0 cost and get genuine buyers & tenants fast

Available on iOS & Android

Download HexaHome on Play StoreDownload HexaHome on App Store

A Product By Hexadecimal Software Pvt. Ltd.

Mobile App Display

Loved what you read? Share it with others!

facebookwhatsapplinkedintwitter