HexaHome

Find Your Dream Home Faster

starstarstarstarstar(5.0)

Golden Line Metro Route: Quick facts

Quotes

Image Source: Google


Commuters can visit the Delhi Metro Rail official website to view the Delhi metro map.

CategoryDetails
Line NameGolden Line (Line 10)
Length25.82 km
Number of Stations15
RouteTughlakabad Station to Delhi Aerocity Metro Station
TypeElevated (4 stations) + Underground (11 stations)
Interchanges
Expected CompletionMarch 2026
Significance- Connects southern Delhi to IGI Airport - Reduces traffic congestion - Driverless metro system

Read More - 🚇 Pink Line Delhi Metro: Route Map, timing ,fare, Stations 2025

Read More - 🚇 Yellow Line Delhi Metro: Route Map, timing ,fare, Stations 2025

hexaHome-promotion

Loading...

Silver line metro construction details

Quotes

Image Source: Google

CategoryDetails
Metro Line NameGolden Line (Line 10)
Project PhasePhase 4
LengthApproximately 24 km
Number of Stations15 (11 underground, 4 elevated)
RouteTughlakabad Station to Delhi Aerocity Metro Station
Interchanges
Elevated Section2.4 km six-lane elevated flyover from Sangam Vihar to Ambedkar Nagar
UnderpassConstruction of an underpass at Saket G Block
Completion DeadlineExpected by March 2026
Significance- Direct airport connectivity - Enhances accessibility for residents in southern Delhi - Incorporates a driverless metro system for efficient travel

You Might Also Like


Showing Properties near to Golden Line (Silver line) Metro

LocationResidential BuyResidential Rent
Vasant KunjBuyRent
ChhatarpurBuyRent
SaketBuyRent

Delhi Metro Golden Line (Silver line): Proposed stations

Station NumberStation NameLayout Type
1Terminal 1 - IGI AirportUnderground
2Delhi AerocityUnderground
3MahipalpurUnderground
4Vasant KunjUnderground
5KishangarhUnderground
6ChhatarpurUnderground
7Chhatarpur MandirUnderground
8IGNOUUnderground
9Neb SaraiUnderground
10Saket G-BlockElevated
11Ambedkar NagarElevated
12KhanpurElevated
13Sangam Vihar - TigriElevated
14Anandmayee Marg JunctionUnderground
15Tughlakabad StationViolet Line

Read More - 🚇 Violet Line Delhi Metro: Route Map, timing ,fare, Stations 2025

Read More - 🚇 list-of-delhi-metro-station

Delhi Metro Golden Line Extension

CategoryDetails
Project NameLajpat Nagar – Saket G-Block Extension (Line 11)
Length8.385 km
TypeElevated line
Number of Stations8
Stations- Lajpat Nagar (interchange) - Andrews Ganj - Greater Kailash – 1 - Chirag Dilli (interchange with Magenta Line) - Pushpa Bhawan - Saket District Centre - Pushp Vihar - Saket G Block (interchange)
Construction Cost₹456 crore for the spur
Construction PackagesPackage D2-C02 involves a 7.298 km elevated viaduct and platforms for the stations
Current StatusBids for construction have been invited, work expected to start soon
Government ApprovalApproved by Central Government in March 2024
SignificanceEnhances connectivity in South Delhi, linking key commercial and residential areas
Expected Completion DateMarch 2026

hexaHome-promotion

Delhi Metro Golden Line Interchange

Interchange StationInterchange Lines
Rajiv ChowkBlue Line (Dwarka Sector 21 to Noida City Centre/Vaishali) Yellow Line (Huda City Centre to Samaypur Badli)
Kashmere GateRed Line (Rithala to Shaheed Sthal) Yellow Line (Huda City Centre to Samaypur Badli) Violet Line (Kashmere Gate to Raja Nahar Singh)
Central SecretariatYellow Line (Huda City Centre to Samaypur Badli) Violet Line (Kashmere Gate to Raja Nahar Singh)
Chawri BazarYellow Line (Huda City Centre to Samaypur Badli) Blue Line (Dwarka Sector 21 to Noida City Centre/Vaishali)
Saket G-BlockPink Line (Majlis Park to Shiv Vihar) Gold Line (Lajpat Nagar – Saket G-Block)
Dwarka Sector 21Airport Express Line Blue Line (Dwarka Sector 21 to Noida City Centre/Vaishali)
Chirag DilliMagenta Line (Janakpuri West to Botanical Garden) Gold Line (Lajpat Nagar – Saket G-Block)
Mandi HouseBlue Line (Dwarka Sector 21 to Noida City Centre/Vaishali) Violet Line (Kashmere Gate to Raja Nahar Singh)
Hazrat NizamuddinPink Line (Majlis Park to Shiv Vihar) Violet Line (Kashmere Gate to Raja Nahar Singh)

Read More - 🚇 Magenta Line Delhi Metro: Route Map, timing ,fare, Stations 2025

Read More - 🚇 Green Line Delhi Metro: Route Map, timing ,fare, Stations 2025

Features and Facilities of Delhi Metro Golden Line (Silver Line)

  • Universal Accessibility: All stations are equipped with escalators, lifts, and tactile tiles for visually impaired passengers.

  • Driverless Metro System: Incorporates advanced technology for efficient and automated operations.

  • Longest Platform: Aerocity Station features the longest platform (289 meters) to handle heavy passenger traffic.

  • Triple Interchange Facility: Aerocity Station connects the Airport Express Line, Golden Line, and Rapid Rail Transit System (RRTS).

  • Depot Connection: Tughlakabad Station is linked to Vasant Kunj Sector-D for operational convenience.

  • Elevated Section: Includes a 2.4 km six-lane elevated flyover from Sangam Vihar to Ambedkar Nagar.

  • Underpass Construction: Saket G Block features an underpass to improve traffic flow.

  • Interchange Facilities:

    1. Yellow Line at Chhatarpur

    2. Airport Express Line at Delhi Aerocity

    3. Violet Line at Tughlakabad.

  • Enhanced Connectivity: Links southern Delhi with IGI Airport Terminal 3, reducing travel time and congestion.

Delhi Metro Golden Line (Silver Line) Fare Information

CategoryDetails
Metro Line NameGolden Line (Silver Line)
Current StatusUnder construction, expected operational by March 2026
Fare StructureExpected to align with existing Delhi Metro fares (₹10 to ₹60 based on distance)
Interchange Facilities- Violet Line at Tughlakabad - Airport Express Line at Delhi Aerocity - Yellow Line at Chhatarpur
Operational TimelineCommercial operations expected by mid-2027
Fare AnnouncementExact fare details will be announced closer to the operational date

Timings for the Delhi Metro Golden Line (Silver Line)

CategoryDetails
Metro Line NameGolden Line (formerly Silver Line)
Current StatusUnder construction, expected operational by March 2026
TimingsSpecific timings not yet disclosed
Expected FeaturesSimilar operational timings as existing lines (early morning to late night)
Construction ProgressOngoing tunneling work; significant milestones achieved
Interchange FacilitiesConnections with Violet Line, Airport Express Line, and Yellow Line
Fare AnnouncementExact fare details will be provided closer to operational date

Showing Properties near to Golden Line (Silver line) Metro

LocationResidential BuyResidential Rent
Vasant KunjBuyRent
ChhatarpurBuyRent
SaketBuyRent

Golden Line metro project timeline

YearMilestone
2016Proposal for the Delhi Metro Golden Line initiated with a length of 20.2 km.
2018Construction plan for the Golden Line finalized by the Delhi government in December.
2019Length increased to 23.6 km after approval from the Central Government in March.
2019Land acquisition process began in April, completed within three years.
2020Alignment changed to avoid damage to historical sites as per Archaeological Survey of India (ASI) recommendations.
2022Construction work officially began in June by Afcons Infrastructure and Larsen & Toubro.
2023Detailed Project Report (DPR) approved for extension to IGI Airport Terminal 1, increasing length to 25.82 km.
2024Name changed from Silver Line to Golden Line in January; expected completion extended to March 2026.
2025First section expected to open for commercial operations no sooner than mid-2027.

Real Estate Impact of Delhi Metro Golden Line (Silver Line)

  • Improved Connectivity: Enhances access to southern Delhi, IGI Airport, Tughlakabad, and Vasant Kunj, attracting residents and businesses.

  • Rising Property Values: Metro proximity boosts property prices in connected areas.

  • Commercial Growth: Increased demand for retail and office spaces near metro stations.

  • Investment Opportunities: Creates hotspots for real estate investment along the corridor.

  • Urban Development: Promotes sustainable and well-planned residential and commercial projects.

  • Economic Boost: Generates jobs and stimulates regional economic growth.


Read More - 🚇 Airport Metro Line Delhi Metro: Route Map, timing ,fare, Stations 2025

hexaHome-promotion

Loading...

FAQs

Q.1What is the Delhi Metro Golden Line?The Golden Line, formerly known as the Silver Line, is a 24-km metro corridor connecting Tughlakabad Station to Delhi Aerocity Metro Station as part of Phase 4.
Q.2When will the Golden Line be operational?The line is expected to be operational by March 2026.
Q.3How many stations are there on the Golden Line?There are 15 stations, with 11 underground and 4 elevated.
Q.4What areas will the Golden Line serve?It will connect South Delhi, Vasant Kunj, IGNOU, Mahipalpur, IGI Airport Terminal 3, and other key areas.
Q.5What are the interchange facilities on the Golden Line?The line will connect with Violet Line at Tughlakabad, Airport Express Line at Delhi Aerocity, Yellow Line at Chhatarpur, and Brown Line at Saket G Block.
Q.6Why was it renamed from Silver to Golden?The name was changed in January 2024 for better visibility and prominence, as golden stands out more clearly than silver on metro trains.
Q.7Will the Golden Line use driverless trains?Yes, it will feature driverless six-coach Alstom trains, making Delhi Metro one of the top five driverless metro systems worldwide.
Q.8What is its significance for commuters?The line will reduce travel time, improve connectivity to IGI Airport, and provide seamless access to residential and commercial hubs in South Delhi.
Scroll to top arrow
grid background

Buy, Sell & Rent Properties – Download HexaHome App Now!

  • Search Icon

    Find your perfect home, PG, or rental in just a few clicks.

  • House Icon

    Post your property at ₹0 cost and get genuine buyers & tenants fast

Available on iOS & Android

Download HexaHome on Play StoreDownload HexaHome on App Store

A Product By Hexadecimal Software Pvt. Ltd.

Mobile App Display

Loved what you read? Share it with others!

facebookwhatsapplinkedintwitter