HexaHome

Find Your Dream Home Faster

starstarstarstarstar(5.0)

Planning to Invest Along Faridabad–Jewar Expressway? Download the App for Verified Property Deals!

Introduction

Faridabad Jewar Expressway is a major upcoming corridor connecting Faridabad to Noida International Airport in Jewar. It aims to enhance regional connectivity, reduce travel time, and boost economic, industrial, and real estate development across the NCR region.

Expressway

Image Source: Google

Overview of Faridabad Jewar Expressway

PeriodKey Developments
2018–2020Concept and feasibility studies for the Faridabad Jewar Expressway were initiated to improve connectivity between Faridabad and the upcoming Noida International Airport.
2021–2022Government approvals and land acquisition processes began, with alignment plans finalized by the National Highways Authority of India (NHAI).
2023Construction work officially started, focusing on initial groundwork, soil testing, and development of access roads.
2024Major construction progress including flyovers, interchanges, and connectivity links to key highways such as Delhi–Mumbai Expressway and Yamuna Expressway.
2025–PresentOngoing development with enhanced infrastructure, green corridors, and smart transport systems aimed at completing the project before Jewar Airport’s full operation.


Loading...

Route Map and Project Details

SectionDetails
Total LengthApproximately 31 km long expressway connecting Faridabad to Jewar Airport in Gautam Buddh Nagar district.
Starting PointBegins near Sector 65, Faridabad, linking with the Delhi–Mumbai Expressway corridor for smooth access.
Ending PointConnects directly to the Noida International Airport (Jewar) terminal access road via the Yamuna Expressway.
Route AlignmentPasses through regions like Ballabhgarh, Palwal, and Dankaur, integrating key industrial and logistics hubs.
Lanes and DesignSix-lane access-controlled expressway with service roads, toll plazas, and intelligent traffic systems (ITS).
Project CostEstimated at ₹2,500–₹3,000 crore, funded through a mix of central and state government initiatives.
Executing AgencyNational Highways Authority of India (NHAI) under the Bharatmala Pariyojana scheme.
Expected CompletionTargeted for completion by 2026 to coincide with the operational launch of Noida International Airport.

Connectivity and Key Locations

Connectivity AspectKey Details
Major Highways LinkedSeamlessly connects with Delhi–Mumbai Expressway, Eastern Peripheral Expressway, and Yamuna Expressway for faster interstate travel.
Airport ConnectivityProvides a direct and fastest route from Faridabad to Noida International Airport (Jewar), cutting travel time to nearly 30–35 minutes.
Metro and Rail AccessClose proximity to Faridabad Metro Line and upcoming Delhi–Varanasi Bullet Train corridor for enhanced multi-modal connectivity.
Industrial Hubs ConnectedLinks major industrial areas like Ballabhgarh, Palwal, Prithla, and Dankaur, improving logistics and freight movement.
Urban Centers NearbyConnects key NCR cities including Faridabad, Noida, Greater Noida, and parts of South Delhi for seamless urban mobility.
Regional BenefitBoosts accessibility between Haryana, Uttar Pradesh, and Delhi, supporting both passenger and commercial transport.
Future ExtensionsPlans to extend connectivity toward Sohna and Gurugram for integrated expressway access across the NCR belt.

You Might Also Like


Looking for Commercial Plots Near Faridabad–Jewar Expressway? Download the App Now!

Infrastructure and Construction Status

AspectCurrent Status
Project CommencementConstruction of the expressway officially began in June 2023 under the National Highways Authority of India (NHAI).
Total Length & RouteApproximately 31 km of greenfield alignment from Sector 65 (Faridabad) to Noida International Airport (Jewar), Uttar Pradesh.
Elevated SectionAn 8.5 km elevated stretch has been approved and pillar-work has begun near Sector 65.
Estimated CostInitial cost ~₹1,650 crore; with elevated section added the revised cost ~₹2,450 crore.
Current ProgressSeveral works underway: soil testing, pillar erection, interchange links with the Delhi–Mumbai Expressway-spur. Project status listed as ‘Under Construction’.
Target CompletionOriginal target was June 2025; latest reports suggest tight timeline and some risk of delay due to elevated section.

Expressway

Image Source: Google

Travel Time and Transportation Benefits

CategoryDetails
Current Travel TimeAt present, it takes around 90–120 minutes to travel between Faridabad and Jewar via existing routes through Noida and Greater Noida.
Expected Travel Time After CompletionThe Faridabad Jewar Expressway will reduce the travel time to approximately 30–35 minutes, offering a seamless connection to Noida International Airport.
Distance ReductionThe expressway shortens the route by nearly 25–30 km compared to the current available highways.
Public Transport IntegrationThe project is expected to link with future metro and bus routes, enhancing multimodal transport options for commuters.
Fuel and Time EfficiencyShorter routes and signal-free travel will significantly reduce fuel consumption, carbon emissions, and vehicle operating costs.
Freight and Logistics AdvantageImproves transportation of goods between Haryana and Uttar Pradesh, promoting faster logistics and reduced delivery times for industries.
Emergency AccessEnables quicker medical and airport emergency access due to direct and high-speed connectivity between major NCR nodes.
Commuter ComfortWide lanes, smart traffic systems, and controlled entry/exit points will ensure smoother, safer, and faster travel experience for daily commuters.
Expressway

Image Source: Google

Old Faridabad Metro Station: Easy Travel Guide read for more

Economic and Industrial Impact

SectorImpact Details
Industrial GrowthThe expressway will stimulate industrial expansion in Faridabad, Palwal, and Dankaur by improving logistics efficiency and access to raw materials and markets.
Employment OpportunitiesThousands of direct and indirect jobs will be created during and after construction, including in infrastructure, logistics, and real estate sectors.
Logistics and WarehousingEnhanced connectivity to the Delhi–Mumbai Expressway and Yamuna Expressway will make the corridor a logistics hub for NCR-based industries.
Real Estate DevelopmentSurrounding regions like Ballabhgarh, Prithla, and Dankaur are witnessing rising land values and investor interest due to proximity to the expressway.
Tourism and TradeThe expressway will support tourism and trade by offering faster access to Jewar Airport and nearby economic zones like Yamuna City and Film City.
Regional Economy BoostBy connecting Haryana and Uttar Pradesh directly, the project enhances inter-state trade and accelerates balanced regional development.
MSME GrowthSmall and medium enterprises (SMEs) in Faridabad and Palwal will benefit from faster transport routes and lower logistics costs.
Foreign Investment PotentialImproved infrastructure and airport proximity are expected to attract FDI in manufacturing, warehousing, and export-oriented industries.

Real Estate Growth and Investment Potential

Area / SectorReal Estate and Investment Insights
FaridabadWitnessing strong real estate appreciation due to expressway proximity. Developers are launching new residential and commercial projects near Sector 65 and Ballabhgarh.
PalwalEmerging as an affordable investment hub. Improved connectivity will turn Palwal into a strategic residential and industrial destination within NCR.
Prithla and DankaurThese regions are attracting logistics parks, warehouses, and mixed-use developments due to their midpoint location between Faridabad and Jewar.
Jewar (Noida International Airport Zone)Massive growth expected with airport-driven development—commercial hubs, business parks, and hospitality sectors are expanding rapidly.
Yamuna Expressway RegionRising land demand for residential townships, tech parks, and institutional projects as connectivity between Jewar and Faridabad improves.
Investment OpportunitiesHigh potential for both short-term and long-term investors as land and property prices are set to appreciate with expressway completion.
Commercial ProspectsIdeal for logistics, warehousing, and industrial parks due to access to Delhi–Mumbai Expressway, Jewar Airport, and NCR’s freight corridor.
Government InitiativesSupported under Bharatmala and NCR development plans, ensuring long-term infrastructure stability and investment confidence.
Expressway

Image Source: Google

Future Expansion and Development Plans

Future PlanDetails
Elevated Section ExpansionAn approved 8.5-km elevated segment will enhance the existing 6-lane route of the Faridabad‑Jewar Expressway, raising overall project cost.
Airport Link ExtensionsPlans exist to build additional expressway links from Noida International Airport (Jewar) to other major highways such as the Ganga Expressway for broader regional connectivity.
Integration with Multi-Modal TransportThe corridor is expected to integrate with future rapid transit and metro lines connecting the NCR region, boosting accessibility and reducing reliance on only road travel.
Industrial & Logistics CorridorsAdjacent areas are earmarked for logistics parks, warehousing and industrial zones to leverage the expressway corridor for freight and supply-chain advantages.
Land Use & Urban Development ZonesZoning plans anticipate mixed-use developments (residential, commercial, institutional) along the expressway to capitalise on improved accessibility and infrastructure.
Phased Completion & Operational TargetsWhile the main stretch aims for completion by June 2025, future link-roads and service lanes may extend beyond that timeframe under staggered implementation.

Loading...

Looking for Affordable Homes Near Jewar Expressway? Click to Download App Available On

FAQs

Que: Where is the Faridabad Jewar Expressway located?
Ans: The Faridabad Jewar Expressway starts from Sector 65 in Faridabad, Haryana, and connects directly to Noida International Airport (Jewar) in Gautam Buddh Nagar, Uttar Pradesh.

Que: What is the total length of the Faridabad Jewar Expressway?
Ans: The expressway is approximately 31 km long and designed as a six-lane, access-controlled corridor with service roads and interchanges for smooth traffic flow.

Que: What is the expected completion date of the Faridabad Jewar Expressway?
Ans: The project is targeted for completion by 2026, with major construction phases expected to be completed in alignment with the Noida International Airport launch.

Que: How much time will the expressway save for commuters?
Ans: Once operational, it will reduce the travel time between Faridabad and Jewar Airport from about 90 minutes to just 30–35 minutes, offering faster airport access.

Que: What benefits will the expressway bring to the region?
Ans: The project will enhance regional connectivity, promote industrial and real estate growth, and boost economic activities across Faridabad, Palwal, Dankaur, and Jewar areas.

Scroll to top arrow
grid background

Buy, Sell & Rent Properties – Download HexaHome App Now!

  • Search Icon

    Find your perfect home, PG, or rental in just a few clicks.

  • House Icon

    Post your property at ₹0 cost and get genuine buyers & tenants fast

Available on iOS & Android

Download HexaHome on Play StoreDownload HexaHome on App Store

A Product By Hexadecimal Software Pvt. Ltd.

Mobile App Display

Loved what you read? Share it with others!

facebookwhatsapplinkedintwitter